Inspection PM Plan - Primary Reformer Furnace
Posted: 07 Sep 2010, 04:16
by qaisarabbas
Dear members,
I am attaching a checklist for PM plans of all the components related to Reformer Furnace (in our case, its Foster Wheeler, Terrace Type Design). Please comment or suggest if I am missing any inspection check on any of the component. Request to share the similar checklist if someone has a more comprehensive. Thank you all.
Primary Reformer Furnace - PM Plan Checklist.jpg
Re: Inspection PM Plan - Primary Reformer Furnace
Posted: 07 Sep 2010, 07:12
by sakib321
Check the hangers expansion and contraction in hot(just after shut down) and cold condition
Re: Inspection PM Plan - Primary Reformer Furnace
Posted: 07 Sep 2010, 22:50
by ben
It looks fine to me.
Do introduce certain other advanced inspection techniques for catalyst tubes.
Re: Inspection PM Plan - Primary Reformer Furnace
Posted: 12 Sep 2010, 18:35
by arcpro
A comprehensive plan.
Thanks for sharing.
Re: Inspection PM Plan - Primary Reformer Furnace
Posted: 23 Oct 2010, 05:14
by inconel
Thanks for sharing
Re: Inspection PM Plan - Primary Reformer Furnace
Posted: 23 Oct 2010, 06:33
by Nabeel Ahmed Qureshi
Thanx for sharing.
NAQ
Re: Inspection PM Plan - Primary Reformer Furnace
Posted: 12 Nov 2010, 17:16
by aterao
The inspection plan well covered all aspects. However, it doesn't contain your acceptance criteria. Do include OD measurement of catalyst tubes at outlet tube sections. Think of renewal as the strain goes above 3%.
Ultrasonic attenuation test looks well engineered & robust, because we pay handsome sum to these guys... But do ask them to provide you with the recorded data of the attenuation test for each individual tube instead of manipulated grading of tubes...
Re: Inspection PM Plan - Primary Reformer Furnace
Posted: 14 Nov 2010, 22:35
by arcpro
Aterao,
You made a valid point regarding OD measurement. That was missing.