O-lets Requirments
Posted: 02 Aug 2010, 11:35
by novice123
In refinery , practically under what conditions do we require each O-lets ( Weldolets , threadolets, Elbolets, sockolets, latrolets)...?
Re: O-lets Requirments
Posted: 03 Aug 2010, 06:01
by novice123
Any idea?
Re: O-lets Requirments
Posted: 03 Aug 2010, 07:25
by ashfaqanwer
Scockolets - are used for taking branch connection in smaller sizes up to 1-1/2" for piping upto 600# rating (see note 1)
Weldolets - are used for taking branch connection in sizes from 1/2" to like 6" or 8" for piping above 600# pressure rating (see note 1)
Note 1: The difference between sockolet and weldolet is towards branch end connection which is socket welded in sockolet and butt welded in weldolet. Later having more strength.
Threadolets - are used in screwed / threaded piping having branch side end connection of threaded joint. They are only used when all the piping is having threaded connections having low pressure conditions
Elbolets - are used to take tapping from elbows for inserting thermowells, pressure gauges, venturi or taking a branch connection. These are used only under some specific requirements.
Laterolets - are used where an odd entry into the running pipe is required to be given in order to have smooth flow into the running pipe with minimum flow interruptions.
Re: O-lets Requirments
Posted: 03 Aug 2010, 08:14
by novice123
Thank you very much Sir for your valuable response.
In case of latrolets , Is there any specific chemicals which require minimum flow interruptions.???
Re: O-lets Requirments
Posted: 03 Aug 2010, 08:18
by arcpro
Latrolets are used where minimum resistance to flow is required.
Re: O-lets Requirments
Posted: 03 Aug 2010, 09:24
by novice123
Is there any specific chemicals which require minimum flow interruptions.???
Re: O-lets Requirments
Posted: 03 Aug 2010, 12:54
by ashfaqanwer
You are welcome novice.
Chemicals not particularly. It depends on the flow conditions, in order to induce lesser turbulence, lesser delta P. Need for latrolet is always a call by process engineer.
Re: O-lets Requirments
Posted: 08 Aug 2010, 09:39
by siva2161
Thanks you boss
Re: O-lets Requirments
Posted: 20 Sep 2010, 12:36
by novice123
1) What is the criteria for using reinforcing Pad for stub-ins . when we will use reinforcing pad for stub-in and when we will not?
Regards
Re: O-lets Requirments
Posted: 20 Sep 2010, 17:05
by arcpro
There is no short cut to assess the requirement of reinforcing pad else performing calculations as described in relevant design code.