Pig launcher design

Chemical engineering, Plant designs related to chemical, petro-chemical or oil&gas, Operational assistance, etc.
Post Reply
tosif
Core Member
Posts: 62
Joined: 15 Mar 2010, 23:46

Pig launcher design

Post by tosif »

Guys, your help required in the design of a pig launching and receiving station. What are the standards regarding delta pressure across pig and flow that should be maintained. What are the piping, pig signaling, quick closure and kicker line standards?
ibrahim
Posts: 80
Joined: 19 Apr 2010, 14:25
Area of interest: Chemical Engineering

Re: Pig launcher design

Post by ibrahim »

tosif, as far as I know, there are no lower limits of pig velocities in pipeline. Where as maximum velocities should be as follows;
For piping in intermittent service:
In case of liquid 8 m/s.
In case of gas 40 m/s.
For piping in continuous service:
In case of liquid 4 m/s.
In case of gas 20 m/s.

For kicker line size specification; I normally used a guideline provided by our licensor.
10" - 14" Main Line: kicker line size should be 4"
16" Main Line: kicker line size should be 6"
18" Main Line: kicker line size should be 8"
(hope your line size lies in above range)

That's I all i know and can share with you. Hope this solves your issues.
Post Reply