Presence of pyrophoric material and vessel internal inspection

Operational issues of any Petrochemical plant or Oil and gas field, upstream issues, etc.
Post Reply
ben
Posts: 291
Joined: 24 Aug 2010, 03:11
Area of interest: Mechanical Engineering

Presence of pyrophoric material and vessel internal inspection

Post by ben »

Operations must be having a controlled procedure to handover pressure vessels for internal inspection carrying potential of pyrophoric material.
What sort of controls are exercised before the vessel is handed over to Inspection and maintenance?
Post Reply