PCC-3 versus API 580/581

Materials Science, Metallurgy, Welding, NDTs, Reliability Assessment, Failure Analysis, etc.
Post Reply
ashfaqanwer
Site Admin
Posts: 443
Joined: 16 Mar 2010, 03:36

PCC-3 versus API 580/581

Post by ashfaqanwer »

Risk based inspection guidelines are provided for inspection engineers in API 580/581. I have also seen a PCC from ASME.
What are the major highlights of the two and the differences? How should one proceed with these standards in order to implement Risk Based Inspection at a petrochemical plant?
Ashfaq Anwer
-PetroStreet.com
Post Reply