Responsibility of LOPC calculations
Responsibility of LOPC calculations
Who should be responsible to perform calculations of LOPC quantification after an incident?
Re: Responsibility of LOPC calculations
This is with process safety engineer or process engineer of the site. Should be run as and when leak is reported to get all the basic data. Once delayed, it may affect reporting, and getting the right information which is available with the operations shift witnessing the leak, and the maintenance staff responsible to fix that.
Re: Responsibility of LOPC calculations
Company is required to have a qualified loss prevention / HSE /Process Safety engineer to run these calculations.
It is important to manage this whole process in a way that immediate reporting is done along with the analysis, the same day when the leak has been reported.
There are parameters which are required to be recorded to have these calculations accurately depicting the right Tier level.
Many a times, a leak which is either Tier-2 or 1 is required to be reported to authorities within 24h basis.
It is important to manage this whole process in a way that immediate reporting is done along with the analysis, the same day when the leak has been reported.
There are parameters which are required to be recorded to have these calculations accurately depicting the right Tier level.
Many a times, a leak which is either Tier-2 or 1 is required to be reported to authorities within 24h basis.
Re: Responsibility of LOPC calculations
We have been thinking about having this as a shared responsibility of Operations, Process, HSE, and Process Safety Engineer.
All we could see was the sheet itself is required to be provided with inputs available with the reporting party (mostly Operations), report goes to HSE for their initial assessment, Process is likely to provide details on the system and yes Process Safety Engineer would be the authority to make a final call once the calculations are done.
All we could see was the sheet itself is required to be provided with inputs available with the reporting party (mostly Operations), report goes to HSE for their initial assessment, Process is likely to provide details on the system and yes Process Safety Engineer would be the authority to make a final call once the calculations are done.