Repetitive piping blockage - Line size increase

Chemical engineering, Plant designs related to chemical, petro-chemical or oil&gas, Operational assistance, etc.
Post Reply
tuan
Posts: 126
Joined: 27 May 2025, 14:07
Area of interest: Chemical Engineering

Repetitive piping blockage - Line size increase

Post by tuan »

In one of our material handling unit, we have been facing issues of repetitive piping blockage. We believe that other than the heat tracing (installed to keep the material in melted form) effectiveness, smaller line size is also playing a role. However, would this be possible to just change the line size to a size bigger without considering other factors like hydraulic balance of the system itself. What are the other considerations?
arcpro
Posts: 391
Joined: 16 Apr 2010, 18:46
Area of interest: Manufacturing Engineering

Re: Repetitive piping blockage - Line size increase

Post by arcpro »

Which service are we talking here, getting blocked?
ivani1
Posts: 115
Joined: 25 May 2025, 14:25
Area of interest: Mechanical Engineering

Re: Repetitive piping blockage - Line size increase

Post by ivani1 »

Just a perspective here, you increase the piping diameter to kill plugging and then you kill velocity, the flow and let another reason of plugging get into the piping...
tuan wrote: 08 May 2026, 09:47 In one of our material handling unit, we have been facing issues of repetitive piping blockage. We believe that other than the heat tracing (installed to keep the material in melted form) effectiveness, smaller line size is also playing a role. However, would this be possible to just change the line size to a size bigger without considering other factors like hydraulic balance of the system itself. What are the other considerations?