Oil chalk test for annular plate to shell welding testing

Materials Science, Metallurgy, Welding, NDTs, Reliability Assessment, Failure Analysis, etc.
Post Reply
Ahmedfromkuwait
Posts: 8
Joined: 25 Jun 2010, 08:28
Area of interest: Mechanical Engineering

Oil chalk test for annular plate to shell welding testing

Post by Ahmedfromkuwait »

Aassalam alekum,

I want detail procedure how to conduct oil chalk test for Shell to annular fillet weld checking.

should chalk powder be wet or dry.

where to apply.
weld to be completed first inside or outside.
Detail procedure appreciable.

Khuda hafees,

Ahmed
arcpro
Posts: 339
Joined: 16 Apr 2010, 18:46
Area of interest: Manufacturing Engineering

Re: Oil chalk test for annular plate to shell welding testin

Post by arcpro »

Wa Alaikum Assalam,
The first pass of the weld shall be completed from inside and then the examination must be done for any leakage.
Why do you want to conduct an oil test? Is it a contractual requirement?
ben
Posts: 194
Joined: 24 Aug 2010, 03:11
Area of interest: Mechanical Engineering

Re: Oil chalk test for annular plate to shell welding testin

Post by ben »

1. Complete one pass of inside fillet weld first
2. Remove all the contaminants, dust particles etc. from the inside fillet weld
3. Visually examine the whole circumference of the weld
4. Apply light diesel (we always use that) on the weld joint
5. Apply dry chalk powder on the outside of the annular plate
6. Wait for four hours
7. Start inspecting the whole circumference closely for any leakage

Cautions:
a. Do not apply so dense chalk powder that the diesel may not be able to come up
b. Diesel must be applied properly on the whole circumference of the inside fillet joint
c. Do not make more than one fillet pass inside in order to conduct the test
d. After successful completion of the test, proper cleaning is mandatory so that no weld contamination must take place
Ahmedfromkuwait
Posts: 8
Joined: 25 Jun 2010, 08:28
Area of interest: Mechanical Engineering

Re: Oil chalk test for annular plate to shell welding testin

Post by Ahmedfromkuwait »

yes it is contract requirement.

As per API only one side is to be welded & from other side oil is injected between the gap of annular plate to shell.
Wet or dry chalk poweder is applied.
needs detail procedure
ben
Posts: 194
Joined: 24 Aug 2010, 03:11
Area of interest: Mechanical Engineering

Re: Oil chalk test for annular plate to shell welding testin

Post by ben »

What more details you want to know?