Dear members,
I am attaching a checklist for PM plans of all the components related to Reformer Furnace (in our case, its Foster Wheeler, Terrace Type Design). Please comment or suggest if I am missing any inspection check on any of the component. Request to share the similar checklist if someone has a more comprehensive. Thank you all.
Inspection PM Plan - Primary Reformer Furnace
-
- Core Member
- Posts: 134
- Joined: 23 Mar 2010, 15:21
- Area of interest: Metallurgy Engineering
Inspection PM Plan - Primary Reformer Furnace
You do not have the required permissions to view the files attached to this post.
Q. Abbas
Re: Inspection PM Plan - Primary Reformer Furnace
Check the hangers expansion and contraction in hot(just after shut down) and cold condition
Sakib Jalal
Re: Inspection PM Plan - Primary Reformer Furnace
It looks fine to me.
Do introduce certain other advanced inspection techniques for catalyst tubes.
Do introduce certain other advanced inspection techniques for catalyst tubes.
Re: Inspection PM Plan - Primary Reformer Furnace
A comprehensive plan.
Thanks for sharing.
Thanks for sharing.
-
- Core Member
- Posts: 87
- Joined: 04 Apr 2010, 09:38
- Area of interest: Mechanical Engineering
Re: Inspection PM Plan - Primary Reformer Furnace
Thanx for sharing.
NAQ
NAQ
Re: Inspection PM Plan - Primary Reformer Furnace
The inspection plan well covered all aspects. However, it doesn't contain your acceptance criteria. Do include OD measurement of catalyst tubes at outlet tube sections. Think of renewal as the strain goes above 3%.
Ultrasonic attenuation test looks well engineered & robust, because we pay handsome sum to these guys... But do ask them to provide you with the recorded data of the attenuation test for each individual tube instead of manipulated grading of tubes...
Ultrasonic attenuation test looks well engineered & robust, because we pay handsome sum to these guys... But do ask them to provide you with the recorded data of the attenuation test for each individual tube instead of manipulated grading of tubes...
Re: Inspection PM Plan - Primary Reformer Furnace
Aterao,
You made a valid point regarding OD measurement. That was missing.
You made a valid point regarding OD measurement. That was missing.