Re: Using blind during hydrotest
Ya.you are right.
- 03 May 2010, 12:38
- Forum: Project Engineers
- Topic: Using blind during hydrotest
- Replies: 13
- Views: 10007
Re: Using blind during hydrotest
Let first discuss Pressure piping code ASME B31.3.There are three statements for designing of blind flanges. (Generally say piping components)
1-Para 303 of ASME B31.3 refer pressure temperature rating for using standardized piping components. I.e. no detailed calculation required. (Para 303 refer ...
1-Para 303 of ASME B31.3 refer pressure temperature rating for using standardized piping components. I.e. no detailed calculation required. (Para 303 refer ...
- 03 May 2010, 10:33
- Forum: Project Engineers
- Topic: Using blind during hydrotest
- Replies: 13
- Views: 10007
Re: Using blind during hydrotest
Using customized blind flanges is cost effective approach.Most of construction sites use this approach to minimize the construction cost.
Please go through figures of ( Fig-UG34) these are customized flanges and can be fabricated from plates.Consider you are testing of equipments where rectangular ...
Please go through figures of ( Fig-UG34) these are customized flanges and can be fabricated from plates.Consider you are testing of equipments where rectangular ...
- 03 May 2010, 08:30
- Forum: Project Engineers
- Topic: Using blind during hydrotest
- Replies: 13
- Views: 10007
Re: Using blind during hydrotest
Customized blind flanges are acceptable as per code.But for design thickness of blind and pipe to cover/blind weld joint geometry should follow code requirments.As per B31.3 Para 304.5.2 customized blind flanges/covers should design as per UG-34 of ASME Section VIII, Div.1.
If end cap of equal ...
If end cap of equal ...
- 01 May 2010, 14:46
- Forum: Shops @ thePetroStreet
- Topic: WeldShop - Released
- Replies: 28
- Views: 496276
Re: WeldShop - Released
Great Effort by Petrostreet team.
- 01 May 2010, 10:50
- Forum: Maintenance Engineers
- Topic: Repair of a cladded vessel
- Replies: 6
- Views: 7387
Re: Repair of a cladded vessel
Nabeel,
1-What kind of NDT required for above procedure.Is vessel needs to be hydrotested??
2-Is there any referance available for above kind of repair in international codes??
RGR
1-What kind of NDT required for above procedure.Is vessel needs to be hydrotested??
2-Is there any referance available for above kind of repair in international codes??
RGR
- 01 May 2010, 09:05
- Forum: Mechanical Engineers
- Topic: PWHT and Stress Relieving
- Replies: 5
- Views: 8315
Re: PWHT and Stress Relieving
Thanks.
- 01 May 2010, 09:02
- Forum: Process & Control Engineers
- Topic: Heat Exchanger Thermal Design
- Replies: 1
- Views: 3581
Heat Exchanger Thermal Design
Some useful data is attached regarding understanding of Heat Exchnager Thermal Design.
HTRI is a powerful tool for thermal design of heat exchangers.
HTRI is a powerful tool for thermal design of heat exchangers.
- 28 Apr 2010, 17:31
- Forum: Mechanical Engineers
- Topic: PWHT and Stress Relieving
- Replies: 5
- Views: 8315
Re: PWHT and Stress Relieving
Thanks Asfaq.Please describe why hardness is controlled during PWHT. (e.g if someone say control hardness level 200 to 220 BHN then what is reason behind it??.How can we calculate hardness level limiting value??).
- 27 Apr 2010, 12:37
- Forum: HSE Engineers
- Topic: Fire and Gas protection system
- Replies: 5
- Views: 32276
Fire and Gas protection system
During designing of "Fire and Gas Protection system”, how we calculate the water spread which should be required for the effected area. What is the key requirements of deluge system?