Spade control should not depend on the PSSR team discovering, line by line, that a spade has been left in the wrong position. That is a weak control philosophy.
The better approach is to treat temporary spading/blinding as a controlled configuration of the process plant, with independent controls at ...
by ivani1
05 Aug 2026, 11:28
Forum: Maintenance Engineers
Topic: Belzona repair on piping pinhole
Replies: 5
Views: 479

Belzona repair on piping pinhole

Maintenance engineers:
What sort of Belzona repair can be applied on piping pinhole having cooling water service?
What are the major considerations?
Applied in all cases? What are the limitations?
by ivani1
05 Aug 2026, 11:26
Forum: Process & Control Engineers
Topic: Reactor runaway temperature excursion
Replies: 3
Views: 1274

Re: Reactor runaway temperature excursion

A reactor runaway is first controlled by the Basic Process Control System through cooling and feed control. If temperature continues to rise, alarms prompt operator intervention. Should the operator fail or the reaction accelerate beyond control, the Safety Instrumented System initiates an automatic ...
by ivani1
05 Aug 2026, 11:21
Forum: Process & Control Engineers
Topic: QRA of country wide pipelines
Replies: 5
Views: 4500

Re: QRA of country wide pipelines

ALOHA still stands out.
by ivani1
05 Aug 2026, 11:20
Forum: HSE Engineers
Topic: Safety Critical Equipment Definition
Replies: 5
Views: 1115

Re: Safety Critical Equipment Definition

Sys1
Just to provide you the reply with the second part of your question, no not all PSVs are considered as safety critical - not those on flammable /hazardous /toxic services where barrier breakdown would lead to a major accident hazard.
by ivani1
27 Jul 2026, 11:18
Forum: Operation Engineers
Topic: P&IDs Updation
Replies: 4
Views: 1387

Re: P&IDs Updation

We can just give it as much importance as any governing body has given. I have not seen any 1st pillar of process safety at any hydrocarbon facility first not talking about process safety information. We do not move further if we have issues here. Even today, most of the audit bodies come in and try ...
by ivani1
27 Jul 2026, 11:11
Forum: Operation Engineers
Topic: Management of applied mitigations
Replies: 3
Views: 868

Re: Management of applied mitigations

We have a specialized module designed within our badic change management system which enables us to perform risk assessment, lock the tags as well and when any necessary maintenance is planned on those lock tags, Operations gets to know through their system that this job requires a risk assessment ...
by ivani1
09 Jul 2026, 09:44
Forum: Process & Control Engineers
Topic: Soft Sensors & APC Performance
Replies: 2
Views: 1037

Soft Sensors & APC Performance

How do soft Sensors enhance APC performance on offshore platforms where online analyzers are limited?
by ivani1
09 Jul 2026, 09:39
Forum: HSE Engineers
Topic: PSSR System
Replies: 8
Views: 2105

Re: PSSR System

Yes, control of PSSR team leader can help ensuring that the field checks are duly made without any gaps. The process is a safety critical one. Our guys perform regular audits on this process. Picking hand filled checklists, ensuring that the controls were adequately checked and with such a good ...
by ivani1
09 Jul 2026, 09:36
Forum: HSE Engineers
Topic: LOPC Calculations Reference
Replies: 5
Views: 55763

Re: LOPC Calculations Reference

Could not find that.
ivani1 wrote: 03 Jul 2026, 09:26 That completely got out of my mind.