Search found 133 matches

by qaisarabbas
28 Dec 2010, 06:51
Forum: Inspection & Reliability Engineers
Topic: Hot Spot Temperature
Replies: 4
Views: 17754

Re: Hot Spot Temperature

Thank you for quality inputs Mechcolor & Arcpro.

So the final cut off limit for declaring Hot Spot is the Max. Allowable Stresses. What is the impact of internal operating pressure to hot spot material?
Like CS, can we operate material upto 427 C safely at any internal operaing pressure?
by qaisarabbas
27 Dec 2010, 16:18
Forum: Inspection & Reliability Engineers
Topic: Hot Spot Temperature
Replies: 4
Views: 17754

Hot Spot Temperature

Any arbitrary value of temperature of a service material above the critical / allowable limit is considered as 'Hot Spot' and the affected area needs some remedial steps to save it from deterioration / damage.

If the definition is correct, what are the criteria for declaring Critical Limit for hot ...
by qaisarabbas
27 Dec 2010, 15:58
Forum: Open Forum
Topic: All Purpose Worksheet
Replies: 1
Views: 56532

Re: All Purpose Worksheet

Really a useful one !
by qaisarabbas
21 Dec 2010, 20:42
Forum: HSE Engineers
Topic: cutting pipe under tension
Replies: 1
Views: 17654

Re: cutting pipe under tension

Hmmm.. Terrible
by qaisarabbas
21 Dec 2010, 20:31
Forum: Inspection & Reliability Engineers
Topic: Difference b/w E-7010 & E-7018
Replies: 10
Views: 34987

Re: Difference b/w E-7010 & E-7018

> E-7010 is a non-backing electrode whereas E-7018 must require backing before welding.
> There is less chances of weld porosity with E-7010 as compared to E-7018.
by qaisarabbas
09 Dec 2010, 19:46
Forum: Open Forum
Topic: thePetroStreet wallpapers
Replies: 1
Views: 58642

Re: thePetroStreet wallpapers

Impressive !
by qaisarabbas
07 Dec 2010, 20:47
Forum: Inspection & Reliability Engineers
Topic: Nipping of Pigtail Tubes in Reformer Furnace
Replies: 3
Views: 7104

Nipping of Pigtail Tubes in Reformer Furnace

At our plant, we faced a leakage of one of the radiant tubes in primary reformer furnace (Foster Wheeler) a week ago. This was the first tube leakage after the service life of around 18 years (versus the estimated design life of some 12 years). Leaking tube has been isolated successfully thru online ...
by qaisarabbas
07 Dec 2010, 19:45
Forum: Inspection & Reliability Engineers
Topic: Pipe exposed to hydrogen flame
Replies: 10
Views: 13973

Re: Pipe exposed to hydrogen flame

Apart with replacement of affected piping, DPT and MT of nearby welds should also be carried out to assess any possible effect on welds.
by qaisarabbas
18 Nov 2010, 04:17
Forum: Shops @ thePetroStreet
Topic: TurboMart - Turbine Performance Evaluator (Released)
Replies: 28
Views: 325461

Re: TurboMart - Turbine Performance Evaluator (Released)

I could not find this type of software for free. Indeed a great effort!!
Long Live TPS
by qaisarabbas
17 Nov 2010, 07:37
Forum: Inspection & Reliability Engineers
Topic: CONAM Inspection of Furnace Radiant Tubes
Replies: 5
Views: 3169

Re: CONAM Inspection of Furnace Radiant Tubes

Thank you for value addition by ben, mechcolor, aterao & piiengineers.