Thank you for quality inputs Mechcolor & Arcpro.
So the final cut off limit for declaring Hot Spot is the Max. Allowable Stresses. What is the impact of internal operating pressure to hot spot material?
Like CS, can we operate material upto 427 C safely at any internal operaing pressure?
Search found 133 matches
- 28 Dec 2010, 06:51
- Forum: Inspection & Reliability Engineers
- Topic: Hot Spot Temperature
- Replies: 4
- Views: 17754
- 27 Dec 2010, 16:18
- Forum: Inspection & Reliability Engineers
- Topic: Hot Spot Temperature
- Replies: 4
- Views: 17754
Hot Spot Temperature
Any arbitrary value of temperature of a service material above the critical / allowable limit is considered as 'Hot Spot' and the affected area needs some remedial steps to save it from deterioration / damage.
If the definition is correct, what are the criteria for declaring Critical Limit for hot ...
If the definition is correct, what are the criteria for declaring Critical Limit for hot ...
- 27 Dec 2010, 15:58
- Forum: Open Forum
- Topic: All Purpose Worksheet
- Replies: 1
- Views: 56532
Re: All Purpose Worksheet
Really a useful one !
- 21 Dec 2010, 20:42
- Forum: HSE Engineers
- Topic: cutting pipe under tension
- Replies: 1
- Views: 17654
Re: cutting pipe under tension
Hmmm.. Terrible
- 21 Dec 2010, 20:31
- Forum: Inspection & Reliability Engineers
- Topic: Difference b/w E-7010 & E-7018
- Replies: 10
- Views: 34987
Re: Difference b/w E-7010 & E-7018
> E-7010 is a non-backing electrode whereas E-7018 must require backing before welding.
> There is less chances of weld porosity with E-7010 as compared to E-7018.
> There is less chances of weld porosity with E-7010 as compared to E-7018.
- 09 Dec 2010, 19:46
- Forum: Open Forum
- Topic: thePetroStreet wallpapers
- Replies: 1
- Views: 58642
Re: thePetroStreet wallpapers
Impressive !
- 07 Dec 2010, 20:47
- Forum: Inspection & Reliability Engineers
- Topic: Nipping of Pigtail Tubes in Reformer Furnace
- Replies: 3
- Views: 7104
Nipping of Pigtail Tubes in Reformer Furnace
At our plant, we faced a leakage of one of the radiant tubes in primary reformer furnace (Foster Wheeler) a week ago. This was the first tube leakage after the service life of around 18 years (versus the estimated design life of some 12 years). Leaking tube has been isolated successfully thru online ...
- 07 Dec 2010, 19:45
- Forum: Inspection & Reliability Engineers
- Topic: Pipe exposed to hydrogen flame
- Replies: 10
- Views: 13973
Re: Pipe exposed to hydrogen flame
Apart with replacement of affected piping, DPT and MT of nearby welds should also be carried out to assess any possible effect on welds.
- 18 Nov 2010, 04:17
- Forum: Shops @ thePetroStreet
- Topic: TurboMart - Turbine Performance Evaluator (Released)
- Replies: 28
- Views: 325461
Re: TurboMart - Turbine Performance Evaluator (Released)
I could not find this type of software for free. Indeed a great effort!!
Long Live TPS
Long Live TPS
- 17 Nov 2010, 07:37
- Forum: Inspection & Reliability Engineers
- Topic: CONAM Inspection of Furnace Radiant Tubes
- Replies: 5
- Views: 3169
Re: CONAM Inspection of Furnace Radiant Tubes
Thank you for value addition by ben, mechcolor, aterao & piiengineers.