Search found 63 matches

by Imran.Idris
04 Nov 2010, 12:53
Forum: Process & Control Engineers
Topic: Oil & Gas dictionary
Replies: 1
Views: 8308

Oil & Gas dictionary

Attached is very comprehensive Oil & Gas dictionary. Good to have thing
by Imran.Idris
04 Nov 2010, 12:45
Forum: Process & Control Engineers
Topic: Volume of horizontal vessel
Replies: 6
Views: 17067

Re: Volume of horizontal vessel

Consider a circle of radius a (the end of the tank) and imagine that the liquid has reached height h, measured from the lowest point on the circle. Note that 0 <= h <= 2a. The area A of the segment of the circle covered by the liquid is

A = pi*a^2/2 - a^2*arcsin(1-h/a) - (a-h)*sqrt(h(2a-h))
V ...
by Imran.Idris
21 Oct 2010, 14:11
Forum: Chemical Engineers
Topic: Complete Learning of HYSYS
Replies: 6
Views: 49221

Re: Complete Learning of HYSYS

Specifying a valve in Hysys: in Steady State / Dynamic Mode
Steady State: For a given flow specify Pressure Drop, required opening of the valve, flow characteristic (Linear, Quick opening, Equal %age etc) and then click size valve. This will specify the CV of the valve in steady state.
Before ...
by Imran.Idris
05 Oct 2010, 05:52
Forum: Process & Control Engineers
Topic: Piping insulation
Replies: 2
Views: 9778

Re: Piping insulation

Please go to the following link. It will guide you through the procedure of insulation thickness calculations.
http://forums.thepetrostreet.com/viewto ... ea56#p1021
by Imran.Idris
27 Sep 2010, 05:22
Forum: Process & Control Engineers
Topic: Things that usually go wrong during commissioning
Replies: 6
Views: 794

Re: Things that usually go wrong during commissioning

You can face following type of general issues during commissioning phase of turbine driven compressor
1)Instruments out of calibration
2)Certain indications not appearing on the control penal / DCS
3)Suction and discharge filters & strainers may get choked during initial flow of steam / gas due to ...
by Imran.Idris
24 Sep 2010, 05:27
Forum: Process & Control Engineers
Topic: Condesate/Hot water Jacket
Replies: 5
Views: 607

Re: Condesate/Hot water Jacket

the things that you need to consider while going for such modification are
1) Required heat duty
2)heat transfer coefficient of the alternate media
3)Area required for intended heat transfer with alternate media. (heat transfer coefficient with steam is usually very high hence requires very little ...
by Imran.Idris
23 Sep 2010, 09:18
Forum: Process & Control Engineers
Topic: Condesate/Hot water Jacket
Replies: 5
Views: 607

Re: Condesate/Hot water Jacket

please describe your problem specifically
by Imran.Idris
20 Sep 2010, 10:13
Forum: Inspection & Reliability Engineers
Topic: TSV (Thermal safety valve)Blockage in sea water piping
Replies: 4
Views: 506

Re: TSV (Thermal safety valve)Blockage in sea water piping

Thermal PR valve is needed for sections of piping 100 ft (30 meter) or more in length which can be blocked in by metal seated valves, and all volumes which can be blocked in by soft seated valves, shall be protected against thermal expansion. Protection shall be provided by a 3/4" NPS (20 mm ...
by Imran.Idris
30 Aug 2010, 18:15
Forum: Process & Control Engineers
Topic: Hazardous Area Classification for Electrical Applications
Replies: 1
Views: 395

Re: Hazardous Area Classification for Electrical Application

Whole Urea plant has been declared non-classified by SP (Urea Technology licenser) this means Prill tower too.
by Imran.Idris
22 Aug 2010, 14:11
Forum: Shops @ thePetroStreet
Topic: Psychro Shop - Released
Replies: 12
Views: 27386

Re: Psychro Shop - Released

Dear forum members, your response has been phenomenal for this developed small utility software and quite motivating for us to explore and develop further such small utilities for petrochemical engineers. Your feed back, in this regard, can be very help full. Please let us know about any issues that ...