Search found 120 matches
- 02 Mar 2026, 18:02
- Forum: Operation Engineers
- Topic: International References for Flaring & Emissions Control
- Replies: 3
- Views: 2203
International References for Flaring & Emissions Control
What internationally acceptable references we have to follow compliance to flaring & emissions?
- 02 Mar 2026, 17:59
- Forum: Maintenance Engineers
- Topic: Brittle Fracture Assessment Tool
- Replies: 6
- Views: 50104
Re: Brittle Fracture Assessment Tool
And the minute later, for you irish.
I had sent email to one of my friend, and never knew that he already replied me back with this.
Enjoy!
I had sent email to one of my friend, and never knew that he already replied me back with this.
Enjoy!
- 02 Mar 2026, 17:57
- Forum: Maintenance Engineers
- Topic: Brittle Fracture Assessment Tool
- Replies: 6
- Views: 50104
Re: Brittle Fracture Assessment Tool
Believe me, I had a sheet somewhere, which I am unable to find now.
But finding still.
But finding still.
- 02 Mar 2026, 17:56
- Forum: Open Forum
- Topic: ClampOX - Temporary Repairs Engineering Software
- Replies: 13
- Views: 111695
Re: ClampOX - Temporary Repairs Engineering Software
Looking forward.
- 02 Mar 2026, 17:55
- Forum: Maintenance Engineers
- Topic: Mill tolerance other than 12.5%
- Replies: 3
- Views: 17065
Re: Mill tolerance other than 12.5%
Thanks all.
- 02 Mar 2026, 17:55
- Forum: Inspection & Reliability Engineers
- Topic: Ferrite Number - SS 347
- Replies: 4
- Views: 15181
Re: Ferrite Number - SS 347
Yes SS347 chemistry, we need to eventually have.
Can't 16-8-2 application provide us that and meeting low FN requirements too?
What exactly would you like to have a final layer chemistry, is that 347?
If yes, I would not say that 16-8-2 would get you that.
You need to have ER347 applied to ...
Can't 16-8-2 application provide us that and meeting low FN requirements too?
What exactly would you like to have a final layer chemistry, is that 347?
If yes, I would not say that 16-8-2 would get you that.
You need to have ER347 applied to ...
- 19 Feb 2026, 17:58
- Forum: Inspection & Reliability Engineers
- Topic: Ferrite Number - SS 347
- Replies: 4
- Views: 15181
Ferrite Number - SS 347
API 582 says in Appendix B, para B3.3 as:
For the overlay alloys listed in Table B.2, ferrite content of the final layer of weld overlay shall be in
the range of 3 FN (Ferrite Number) to 10 FN, except for Type 347 that shall have a range of 5 FN to 11 FN.
Minimum FN for Type 347 may be reduced to ...
For the overlay alloys listed in Table B.2, ferrite content of the final layer of weld overlay shall be in
the range of 3 FN (Ferrite Number) to 10 FN, except for Type 347 that shall have a range of 5 FN to 11 FN.
Minimum FN for Type 347 may be reduced to ...
- 15 Feb 2026, 11:22
- Forum: Maintenance Engineers
- Topic: Mill tolerance other than 12.5%
- Replies: 3
- Views: 17065
Mill tolerance other than 12.5%
In what cases, piping mill tolerances are set to other than default 12.5% value?
- 11 Feb 2026, 12:39
- Forum: Open Forum
- Topic: ClampOX - Temporary Repairs Engineering Software
- Replies: 13
- Views: 111695
Re: ClampOX - Temporary Repairs Engineering Software
Yeah, I am also looking forward to have something published on clampox.com
That would even provide a better reference what PetroStreet is developing as part of this tool.
That would even provide a better reference what PetroStreet is developing as part of this tool.
- 08 Feb 2026, 15:12
- Forum: Open Forum
- Topic: ClampOX - Temporary Repairs Engineering Software
- Replies: 13
- Views: 111695
Re: ClampOX - Temporary Repairs Engineering Software
This solution is needed, and I do not think that anybody would disagree that current control is less with the sites engineering, installing, and managing.
Starting from steam condensate service, hazard gets involved alleviating the criticality of the temporary repair to be engineered, and designed ...
Starting from steam condensate service, hazard gets involved alleviating the criticality of the temporary repair to be engineered, and designed ...