PetroStreet,
Where have you been on this software?
Search found 328 matches
- 08 Sep 2026, 14:07
- Forum: Open Forum
- Topic: ClampOX - Temporary Repairs Engineering Software
- Replies: 30
- Views: 177451
- 08 Sep 2026, 14:06
- Forum: Project Engineers
- Topic: Temporary Repair Engineering
- Replies: 2
- Views: 2857
Re: Temporary Repair Engineering
This is the responsibility of Technical Engineering department to either engineer the repair, get the consultant involved, review it with all involved and then allow for implementation. No temporary repair should go unchecked from Technical function.
- 29 Aug 2026, 08:32
- Forum: HSE Engineers
- Topic: HSE Actions Implementation
- Replies: 4
- Views: 3409
Re: HSE Actions Implementation
I would say this is a continuous struggle.
Actions are just coming from many sources including the regular internal & external audits.
I sometimes sit and think that even the actions in form of minutes from all different meetings are taken well care of, job is well done.
Change management reviews ...
Actions are just coming from many sources including the regular internal & external audits.
I sometimes sit and think that even the actions in form of minutes from all different meetings are taken well care of, job is well done.
Change management reviews ...
- 29 Aug 2026, 08:28
- Forum: Inspection & Reliability Engineers
- Topic: Difference between SA451 CPF3M & CPF8M?
- Replies: 2
- Views: 2959
Re: Difference between SA451 CPF3M & CPF8M?
The primary difference between SA-451 Grade CPF3M and SA-451 Grade CPF8M lies in their carbon content.
SA-451 governs centrifugally cast austenitic steel pipe (analogous to static casting grades like CF3M/CF8M under SA-351).
CPF3M: Is the low-carbon variant (maximum 0.03% carbon). The "3" indicates ...
SA-451 governs centrifugally cast austenitic steel pipe (analogous to static casting grades like CF3M/CF8M under SA-351).
CPF3M: Is the low-carbon variant (maximum 0.03% carbon). The "3" indicates ...
- 29 Aug 2026, 08:24
- Forum: Maintenance Engineers
- Topic: Rubber Expansion Joins with & without Control Units
- Replies: 4
- Views: 2844
Re: Rubber Expansion Joins with & without Control Units
Control units are installed on rubber expansion joints whenever the surrounding piping system cannot safely absorb internal pressure thrust or restrict extreme pipe movements.
Absence of Fixed Main Anchors: When the piping layout lacks heavy structural anchors to hold the pipe against internal ...
Absence of Fixed Main Anchors: When the piping layout lacks heavy structural anchors to hold the pipe against internal ...
- 22 Aug 2026, 19:57
- Forum: Inspection & Reliability Engineers
- Topic: Spring Supports Inspection Program
- Replies: 5
- Views: 2639
Re: Spring Supports Inspection Program
Program should be defined in a way that you must not miss any area within your facility where there is a spring support and it is not included with correct dataset.
Make sure you assign area inspectors this task of logging in all spring supports from drawings and field inspection.
Enlist their ...
Make sure you assign area inspectors this task of logging in all spring supports from drawings and field inspection.
Enlist their ...
- 22 Aug 2026, 19:53
- Forum: Inspection & Reliability Engineers
- Topic: Fusion bonded epoxy performance in aggressive sea water
- Replies: 3
- Views: 1873
Re: Fusion bonded epoxy performance in aggressive sea water
Practically to understand the coating performance, I would recommend you to apply on some test spools during an opportunity, keep them in service for a year or so, wait for another opportunity where you can bring those spools down, and perform inspection.
This way you should be knowing more where to ...
This way you should be knowing more where to ...
- 22 Aug 2026, 19:51
- Forum: HSE Engineers
- Topic: HSE Critical Positions
- Replies: 3
- Views: 2169
Re: HSE Critical Positions
I do not think that engineers, senior engineers and beyond can be considered as HSE critical roles despite attending risk assessments.
It is about performing an HSE critical job - only those roles /positions should be categorized.
Like rigger, crane operator, operator, technician, inspector etc.
It is about performing an HSE critical job - only those roles /positions should be categorized.
Like rigger, crane operator, operator, technician, inspector etc.
- 14 Aug 2026, 12:09
- Forum: Operation Engineers
- Topic: Line spading controls
- Replies: 5
- Views: 4203
Re: Line spading controls
Putting spades required a management of change process where you get your spade design approved through the committee.
Now this is when you are using spades while the system is down.
Once you are charging back up with some spades still in location, a risk review supported with change management ...
Now this is when you are using spades while the system is down.
Once you are charging back up with some spades still in location, a risk review supported with change management ...
- 14 Aug 2026, 12:06
- Forum: HSE Engineers
- Topic: HIPO - Which one is?
- Replies: 3
- Views: 2140
Re: HIPO - Which one is?
Let me put that in this way:
A High Potential Incident is an unplanned event, including an actual incident or near miss, where the credible worst-case consequence under reasonably foreseeable circumstances could have resulted in a fatality, permanent/life-changing injury, multiple serious injuries ...
A High Potential Incident is an unplanned event, including an actual incident or near miss, where the credible worst-case consequence under reasonably foreseeable circumstances could have resulted in a fatality, permanent/life-changing injury, multiple serious injuries ...