Temporary repairs at any site are one of the critical area which requires close monitoring.
1st and foremost approach towards any temporary repair is to consider that as temporary where risk can be increased at any point in time and all measures should be made to turn that temporary repair to a ...
Search found 333 matches
- 10 Nov 2026, 10:12
- Forum: Inspection & Reliability Engineers
- Topic: Inspection of temporary repairs at site
- Replies: 1
- Views: 1922
- 02 Nov 2026, 11:40
- Forum: Project Engineers
- Topic: Design for wind loads
- Replies: 3
- Views: 3715
Re: Design for wind loads
Go through ASCE publication on "Wind Load Design for Petrochemical and Other Industrial Facilities", Second Edition.
It would provide you with the details on what you are looking for.
It would provide you with the details on what you are looking for.
- 24 Oct 2026, 10:41
- Forum: Inspection & Reliability Engineers
- Topic: Steel Structure Inspection
- Replies: 3
- Views: 3527
Re: Steel Structure Inspection
Without a doubt for all structural supports for pressure vessels, heat exchangers, external visual inspection as per API 510 should cover for any defect whatsoever.
That should also be including any associated ladders, platform, access ways also.
This is a critical and mandatory check to be made ...
That should also be including any associated ladders, platform, access ways also.
This is a critical and mandatory check to be made ...
- 12 Oct 2026, 18:17
- Forum: PetroNavigator® - Engineering Interactions with AI
- Topic: EngiChat Experience
- Replies: 2
- Views: 3850
Re: EngiChat Experience
Thanks for sharing, I downloaded and the only think I wanted to try was code compliance and it is asking me just to join a plan.
I am not sure if I am doing something not right.
I am not sure if I am doing something not right.
- 12 Oct 2026, 18:10
- Forum: Inspection & Reliability Engineers
- Topic: Piping support movements
- Replies: 3
- Views: 5417
Re: Piping support movements
Para 5.5.5 of API 570 5th edition-2024 clearly states, "External inspections shall include surveys for the condition of piping hangers and supports. Instances of cracked or broken hangers, “bottoming out” of spring supports, support shoes displaced from support members, or other improper restraint ...
- 08 Sep 2026, 14:07
- Forum: Open Forum
- Topic: ClampOX - Temporary Repairs Engineering Software
- Replies: 32
- Views: 192331
Re: ClampOX - Temporary Repairs Engineering Software
PetroStreet,
Where have you been on this software?
Where have you been on this software?
- 08 Sep 2026, 14:06
- Forum: Project Engineers
- Topic: Temporary Repair Engineering
- Replies: 2
- Views: 5214
Re: Temporary Repair Engineering
This is the responsibility of Technical Engineering department to either engineer the repair, get the consultant involved, review it with all involved and then allow for implementation. No temporary repair should go unchecked from Technical function.
- 29 Aug 2026, 08:32
- Forum: HSE Engineers
- Topic: HSE Actions Implementation
- Replies: 4
- Views: 5915
Re: HSE Actions Implementation
I would say this is a continuous struggle.
Actions are just coming from many sources including the regular internal & external audits.
I sometimes sit and think that even the actions in form of minutes from all different meetings are taken well care of, job is well done.
Change management reviews ...
Actions are just coming from many sources including the regular internal & external audits.
I sometimes sit and think that even the actions in form of minutes from all different meetings are taken well care of, job is well done.
Change management reviews ...
- 29 Aug 2026, 08:28
- Forum: Inspection & Reliability Engineers
- Topic: Difference between SA451 CPF3M & CPF8M?
- Replies: 2
- Views: 5392
Re: Difference between SA451 CPF3M & CPF8M?
The primary difference between SA-451 Grade CPF3M and SA-451 Grade CPF8M lies in their carbon content.
SA-451 governs centrifugally cast austenitic steel pipe (analogous to static casting grades like CF3M/CF8M under SA-351).
CPF3M: Is the low-carbon variant (maximum 0.03% carbon). The "3" indicates ...
SA-451 governs centrifugally cast austenitic steel pipe (analogous to static casting grades like CF3M/CF8M under SA-351).
CPF3M: Is the low-carbon variant (maximum 0.03% carbon). The "3" indicates ...
- 29 Aug 2026, 08:24
- Forum: Maintenance Engineers
- Topic: Rubber Expansion Joins with & without Control Units
- Replies: 4
- Views: 5320
Re: Rubber Expansion Joins with & without Control Units
Control units are installed on rubber expansion joints whenever the surrounding piping system cannot safely absorb internal pressure thrust or restrict extreme pipe movements.
Absence of Fixed Main Anchors: When the piping layout lacks heavy structural anchors to hold the pipe against internal ...
Absence of Fixed Main Anchors: When the piping layout lacks heavy structural anchors to hold the pipe against internal ...