Re: preplanning the lifting

As per code & standard it should be 25% at a minimum but in situation I have practiced 10% at a minimum.
Lifting equipment manufacturer keeps a safety margin of 25% with respect to lifting equipment safety, other than that we take another 25% safety margin in rigging studies at a minimum as per code ...
by gujral502
06 Oct 2010, 05:48
Forum: Inspection & Reliability Engineers
Topic: Hydro Pneumatic Test Procedure Required
Replies: 8
Views: 3962

Re: Hydro Pneumatic Test Procedure Required

Ben, thank you for such descriptive info.
by gujral502
06 Oct 2010, 05:32
Forum: Inspection & Reliability Engineers
Topic: Standard Workability Reference For Production welders & Fab
Replies: 4
Views: 1960

Re: Standard Workability Reference For Production welders &

Actually what I was looking for is an approximate standard working capability so when I compared this formulation with my previous experience, it works indeed.
Anyway thanks for your guidance & time.
by gujral502
05 Oct 2010, 14:00
Forum: Inspection & Reliability Engineers
Topic: Standard Workability Reference For Production welders & Fab
Replies: 4
Views: 1960

Re: Standard Workability Reference For Production welders &

Thanks, this operating factor will obviously help me to plan my fabrication and welding accordingly.
by gujral502
05 Oct 2010, 11:07
Forum: Inspection & Reliability Engineers
Topic: Standard Workability Reference For Production welders & Fab
Replies: 4
Views: 1960

Standard Workability Reference For Production welders & Fab

If anyone knows about any reference/programe or evaluation method (with the reference of code & standard) to calculate the standard workability of a production welder against different welding methods, also same in case of fabricators that how much Dia Inch one fabricator can perform in 8 hours ...
by gujral502
04 Oct 2010, 12:21
Forum: Inspection & Reliability Engineers
Topic: Hydro Pneumatic Test Procedure Required
Replies: 8
Views: 3962

Re: Hydro Pneumatic Test Procedure Required

Qaisar, Infact this is one test which is carried out simultaneosly and is called by Hydro-Pneumatic Test.
The link you have passed is the comparison of Hydro Test & Pneumatic Test.
Kindly update if you find any relevant data on this.
by gujral502
04 Oct 2010, 09:16
Forum: Inspection & Reliability Engineers
Topic: Hydro Pneumatic Test Procedure Required
Replies: 8
Views: 3962

Hydro Pneumatic Test Procedure Required

Any one knows about the detailed Hydro Pneumatc Test Procedure For Floating Roof (Double/Single Deck) Storage Tanks & Fix Conical Roof Storage Tanks.

Thanx in anticipation.
by gujral502
01 Oct 2010, 12:39
Forum: Maintenance Engineers
Topic: Rigging Calculation Programs
Replies: 0
Views: 1446

Rigging Calculation Programs

Here is a website that has rigging calculation programs that you can try

http://www.maximumreach.com/software.htm

Its very useful indded, if you have basic knowledge about rigging then having this programe you dont need any specialist to consult with.

Gujral.
by gujral502
21 Aug 2010, 09:34
Forum: Shops @ thePetroStreet
Topic: WeldShop - Released
Replies: 28
Views: 496330

Re: WeldShop - Released

Its Sadaqa Ja'riya guys, may Allah Almighty award you divine blessings & every success in life ever. (aamin).
by gujral502
21 Aug 2010, 09:25
Forum: Shops @ thePetroStreet
Topic: RepairShop - Released
Replies: 14
Views: 190688

Re: RepairShop - Releasing Soon

Would be Great self-grooming info indeed.