Usually for a running gas turbine routine sample is collected at the exhaust. Sometimes O2 analyzer is also installed at the exhaust stream of Gas Turbine. Usually it runs between 13~16% on dry basis.
At out plant exhaust flow is not measured, however at some plants it is also being measured.
Search found 33 matches
- 22 Nov 2010, 06:20
- Forum: Shops @ thePetroStreet
- Topic: TurboMart - Turbine Performance Evaluator (Released)
- Replies: 28
- Views: 325473
- 08 Oct 2010, 05:46
- Forum: Operation Engineers
- Topic: Snam Progetti Urea Plant VS StamiCarb
- Replies: 0
- Views: 18591
Snam Progetti Urea Plant VS StamiCarb
Can any body share with me the difference in Urea technologies for Snam Progetti and Stamicarb. Operational differences and indices for both the plants.
Thanks in advance
Thanks in advance
- 08 Oct 2010, 05:38
- Forum: Operation Engineers
- Topic: Reciprocating compressor operating issue
- Replies: 0
- Views: 17232
Reciprocating compressor operating issue
We have a reciprocating compressor (five staged). It has poppet valves (check valves to prevent back flow)in its 2nd stage.
An issue that we have started facing is that when first stage outlet is cooled by interstage cooler and sent to KOD installed at the inlet of 2nd stage, we find an increase in ...
An issue that we have started facing is that when first stage outlet is cooled by interstage cooler and sent to KOD installed at the inlet of 2nd stage, we find an increase in ...
- 08 Oct 2010, 05:23
- Forum: Operation Engineers
- Topic: Operating Manual Preparation
- Replies: 0
- Views: 20137
Operating Manual Preparation
Can any body tell me what should be the format of an operating manual that is helpful to an area operator and it's easy to understand.
- 01 Oct 2010, 14:17
- Forum: Process & Control Engineers
- Topic: Alkali Boil-out
- Replies: 11
- Views: 59147
Re: Alkali Boil-out
Can you please elaborate a little more, what types of chemicals are used and different steps involved.
- 29 Sep 2010, 09:51
- Forum: Shops @ thePetroStreet
- Topic: TurboMart - Turbine Performance Evaluator (Released)
- Replies: 28
- Views: 325473
Re: TurboMart
I am sure this is going to be one big release as you guys released some other utilities, very handy ones, but you never asked for any suggestions. This time it is different from the previous ones.
Can you make this software interact-able with real time values of a running gas turbine /steam turbine ...
Can you make this software interact-able with real time values of a running gas turbine /steam turbine ...
- 29 Sep 2010, 09:05
- Forum: Process & Control Engineers
- Topic: Painting job contract in process plants (Equipment/piping)
- Replies: 4
- Views: 2868
Re: Painting job contract in process plants (Equipment/pipin
Thanks whaider, that is really helpful. Can you please share a typical specification in this regard? Also can you please provide RAL colors chart? Thanks in advance for that.
- 29 Sep 2010, 06:45
- Forum: Process & Control Engineers
- Topic: Painting job contract in process plants (Equipment/piping)
- Replies: 4
- Views: 2868
Painting job contract in process plants (Equipment/piping)
Can some one guide me on how to take guarantees from a Contractor hired for painting jobs on process plant at a very large scale.
Also, please let me know the standards that are normally used for such jobs.
Also, please let me know the standards that are normally used for such jobs.
- 28 Sep 2010, 15:56
- Forum: Process & Control Engineers
- Topic: PSV Sizing
- Replies: 7
- Views: 119895
Re: PSV Sizing
following things to know before you go for PSV sizing
1)Basis for PSV sizing, i.e., external fire, tube rupture case, discharge valve closure, exothermic reaction run away. This is important to know prior you go through PSV sizing. Then there are standards available which guide you in determining ...
1)Basis for PSV sizing, i.e., external fire, tube rupture case, discharge valve closure, exothermic reaction run away. This is important to know prior you go through PSV sizing. Then there are standards available which guide you in determining ...
- 28 Sep 2010, 15:38
- Forum: Process & Control Engineers
- Topic: Things that usually go wrong during commissioning
- Replies: 6
- Views: 6286
Re: Things that usually go wrong during commissioning
This was the second thing I asked for in my query. Though we have a pre-com checklist available with us, however I wanted to compare it with some other industrial practices.
Thanks every body for your useful contributions.
Thanks every body for your useful contributions.